Printable version of this article
Copyright Information
Privacy Policy
Powered by Opus 2.25
|
 |
Report of the Trees and Waterways sub committee (19 November 2003)
Working party
A working party has cleared a section 50 yards north of the pumping
station. Access had previously not been possible because of the
depth of water . This identified a pinch point and led to the
removal of a large mainly rotten ash which had in part been blown down in the winds a year ago. Some further work is required.
Area north of the sluice in Brook Street
A sector of the grassed area to the north of the sluice has been
scraped clear. This should provide better access to water flowing.
|
|