Report of the Trees and Waterways sub committee (19 November 2003)

Working party

A working party has cleared a section 50 yards north of the pumping station. Access had previously not been possible because of the depth of water . This identified a pinch point and led to the removal of a large mainly rotten ash which had in part been blown down in the winds a year ago. Some further work is required.

Area north of the sluice in Brook Street

A sector of the grassed area to the north of the sluice has been scraped clear. This should provide better access to water flowing.